METHODOLOGY

The Road Safety Appraisal Team was established as follows:

Skip: Interactive content (iframe)

The interactive content below might not be fully accessible.

  • The appraisal was undertaken after detailed examination of the submitted documents, and a visit to the site on 3 August 2017 between 15:00 (daylight) and 19:00 (night-time). The weather was warm and clear. The road surface was dry.

  • The Appraisal Team did a desktop review of the area via Google Earth to familiarise themselves with the location of the appraisal.

  • Apart from previous reports, no drawings were received or reviewed as part of the appraisal. The traffic and accident data referred to in this appraisal report have been extracted from previous reports.