Intervention Rating
As part of the appraisal process, an intervention rating matrix has been developed to assist the Department in prioritizing the interventions with planned remedial programmes. The table below is currently in a draft format and will be developed further.
Table 5-2: Intervention Measures
Intervention Level | Remedial Action | Cost Implication | Intervention carried out by | Professional Team Inputs |
1 | Clearing of Vegetation, Guardrail Repair, Existing signage erection, Re-instate Road Markings | Low | Maintenance | None |
2 | Pothole repairs, New Guardrail Installations, New Signage Installations, New Road Markings | Low | Maintenance | None |
3 | Construction of:
| Low-Medium | Emerging Contractor Engagement | None |
4 | Construction of:
| Medium | Established Contractors | Intervention requires design inputs to be verified and signed off |
5 | Major construction activities to implement a designed intervention | High | Established Contractors | Requires full Service |