METHODOLOGY

The Road Safety Audit Team was established as follows: 

Skip: Interactive content (iframe)

The interactive content below might not be fully accessible.

  • The Audit was undertaken after detailed examination of the submitted documents, and a visit to the site on 3 August 2017 between 14h00 to 16h30 (daylight) and 19h00 to 20h20 (night-time). The weather was warm and clear with occasional overcast conditions. The road surface was dry.

  • The Road Safety Audit was undertaken on the project, detailed in the following documentation:

    • No details about P21-1 were received from the client

Drawing nos.

Ver

Title

   
   
   
  

No detail construction drawings No as built drawings

No Line marking drawings

No departure from standards was submitted to the Audit Team.