INTERVENTION MEASURES
Intervention Level | Remedial Action | Cost Implication | Intervention carried out by | Professional Team Inputs | |
1 | Clearing of Vegetation, Guardrail Repair, Existing signage erection, Re-instate Road Markings | Low | Maintenance | None | |
2 | Pothole repairs, New Guardrail Installations, New Signage Installations New Road Markings | Low | Maintenance | None | |
Construction of: | |||||
3 |
| Low-Medium | Emerging Contractor Engagement | None | |
repairs,
| |||||
Construction of: | |||||
4 |
| Medium | Established Contractors | Intervention requires design inputs to be verified and signed off | |
| |||||
5 | Major construction activities to implement a designed intervention | High | Established Contractors | Requires Service | full |
Intervention rating of proposed mitigation measures
RISK ITEM | Intervention rating |
Item 1: No Enough Sight distance | 1 |
Item 2: Pedestrian loading and drop-off zone | 1 |
Item 3: No crash barriers alongside deep excavated drainage | 2 |
Item 4: Truck waiting for loading along the road | 1 |