INTERVENTION MEASURES

Intervention Level

Remedial Action

Cost Implication

Intervention carried out by

Professional Team Inputs

1

Clearing  of  Vegetation, Guardrail Repair,

Existing signage erection,

Re-instate Road Markings

Low

Maintenance

None

2

Pothole repairs,

New  Guardrail  Installations, New Signage Installations

New Road Markings

Low

Maintenance

None

 

Construction of:

   

3

  • Speedhumps,

  • rumble strips,

  • footpaths,

  • kerbing and channelling,

  • stormwater infrastructure

Low-Medium

Emerging Contractor Engagement

None

 

repairs,

  • Edge beams at accesses

   
 

Construction of:

   

4

  • surfaced shoulders,

  • roadway widening,

  • re-configuration of accesses,

  • Public Transport Facilities Installation of:

Medium

Established Contractors

Intervention requires design inputs to be verified and

signed off

 
  • traffic signals,

  • streetlighting

   

5

Major construction activities to implement a designed intervention

High

Established Contractors

Requires Service

full

Intervention rating of proposed mitigation measures

RISK ITEM

Intervention rating

Item 1:

No Enough Sight distance

1

Item 2:

Pedestrian loading and drop-off zone

1

Item 3:

No crash barriers alongside deep excavated drainage

2

Item 4:

Truck waiting for loading along the road

1