INTERVENTION MEASURES

Intervention Level

Remedial Action

Cost Implication

Intervention carried out by

Professional Team Inputs

1

Clearing of Vegetation, Guardrail Repair,

Existing signage erection, Re-instate Road Markings

Low

Maintenance

None

2

Pothole repairs,

New Guardrail Installations, New Signage Installations

New Road Markings

Low

Maintenance

None

3

Construction of:

  • Speedhumps,

  • rumble strips,

  • footpaths,

  • kerbing and channelling,

  • stormwater infrastructure repairs,

  • Edge beams at accesses

Low-Medium

Emerging Contractor Engagement

None

4

Construction of:

  • surfaced shoulders,

  • roadway widening,

  • re-configuration of accesses,

  • Public Transport Facilities

Installation of:

  • traffic signals,

  • street lighting

Medium

Established Contractors

Intervention requires design inputs to be verified and signed off

5

Major construction activities

to implement a designed intervention

High

Established Contractors

Requires full Service

Intervention rating of proposed mitigation measures

RISK ITEM

Intervention Level

1. PROBLEM - POTHOLES

2

2. PROBLEM – LACK OF ADVANCE SIGNAGE

1

3. PROBLEM - GUARDRAIL’S DEFLECTION ANGLE

1

Road Safety Appraisal Report, Provincial Road 15-1

4. PROBLEM - DAMAGED GUARDRAILS

1

5. PROBLEM - GUARDRAIL END-TREATMENT

1

6. PROBLEM - LACK OF PEDESTRIAN INFRASTRUCTURE

3

7. PROBLEM - FALLEN ROCKS

1

8. PROBLEM – MERGING LANES

1

9. PROBLEM – CLOGGED V-DRAINS

1