INTERVENTION MEASURES
Intervention Level | Remedial Action | Cost Implication | Intervention carried out by | Professional Team Inputs |
1 | Clearing of Vegetation, Guardrail Repair, Existing signage erection, Re-instate Road Markings | Low | Maintenance | None |
2 | Pothole repairs, New Guardrail Installations, New Signage Installations New Road Markings | Low | Maintenance | None |
3 | Construction of:
| Low-Medium | Emerging Contractor Engagement | None |
4 | Construction of:
Installation of:
| Medium | Established Contractors | Intervention requires design inputs to be verified and signed off |
5 | Major construction activities to implement a designed intervention | High | Established Contractors | Requires full Service |
Intervention rating of proposed mitigation measures
RISK ITEM | Intervention Level |
1. PROBLEM - POTHOLES | 2 |
2. PROBLEM – LACK OF ADVANCE SIGNAGE | 1 |
3. PROBLEM - GUARDRAIL’S DEFLECTION ANGLE | 1 |
Road Safety Appraisal Report, Provincial Road 15-1
4. PROBLEM - DAMAGED GUARDRAILS | 1 |
5. PROBLEM - GUARDRAIL END-TREATMENT | 1 |
6. PROBLEM - LACK OF PEDESTRIAN INFRASTRUCTURE | 3 |
7. PROBLEM - FALLEN ROCKS | 1 |
8. PROBLEM – MERGING LANES | 1 |
9. PROBLEM – CLOGGED V-DRAINS | 1 |